BA2: Planning and control
45 free practice questions on planning and control, Section C of the CIMA Management Accounting (BA2) question bank. Topics include Materials usage variance, Labour efficiency variance, Sales volume contribution variance, Flexible budget allowance, Purpose of budgeting, Production budget. Each question carries its syllabus reference and a worked explanation. Practise them in the quiz with instant feedback, or read every question with its answer further down this page.
→ Full BA2 question bank and timed mock exam
→ BA2 Common Mistakes
→ BA2 Formula Sheet
Loading questions…
All 45 planning and control questions
The same questions the quiz above draws on, in syllabus order, each with its answer and worked explanation. 21 are multiple choice and 24 are numerical, where you work the answer out before choosing it.
Which of the following best describes a primary purpose of preparing a budget?
- To guarantee that the organisation makes a profit
- To plan and control the organisation's use of resources
- To remove the need to prepare financial statements
- To calculate the organisation's tax liability
Show answer and explanation
Answer: B. Budgets are prepared to plan ahead and to provide a benchmark against which actual performance can be controlled. They do not guarantee profit — they are a plan, not an outcome. They do not replace statutory financial statements, which serve external reporting purposes. They are not a tax computation. Planning and control are the two purposes consistently emphasised in the syllabus.
A company budgets to sell 50,000 units of a product next period. Opening finished goods inventory is 8,000 units and the company wishes to hold closing finished goods inventory of 6,000 units. How many units should be budgeted for production?
- 50,000 units
- 48,000 units
- 52,000 units
- 64,000 units
Show answer and explanation
Answer: B. Production budget = sales + closing inventory − opening inventory = 50,000 + 6,000 − 8,000 = 48,000 units. Because closing inventory is lower than opening inventory, some demand is met from existing stock, so production is below sales. The 50,000 figure ignores the inventory movement; 52,000 reverses the adjustment, adding opening and deducting closing; and 64,000 adds both inventory figures to sales.
A cash budget projects a significant cash shortfall in three months' time. Which of the following is the most appropriate management response?
- Arrange short-term financing, such as an overdraft facility, in advance
- Immediately increase the selling price of all products
- Stop preparing cash budgets to avoid the warning
- Record the projected shortfall as an expense in the income statement
Show answer and explanation
Answer: A. The value of a cash budget is that it gives advance warning, allowing management to arrange financing or reschedule payments before the shortfall occurs. Raising all prices is a drastic step that could reduce demand and is not the direct response to a timing issue. Ceasing to budget removes the early-warning benefit entirely. A projected shortfall is not an accounting expense — it is a forecast cash position, not a transaction.
A company's original budget at 10,000 units shows variable costs of £50,000 and fixed costs of £30,000. Actual activity was 12,000 units. What is the flexed total cost allowance for 12,000 units?
- £80,000
- £96,000
- £90,000
- £60,000
Show answer and explanation
Answer: C. Flexing adjusts variable costs to the actual activity level while leaving fixed costs unchanged. Variable cost per unit = £50,000 ÷ 10,000 = £5. Flexed variable cost = 12,000 × £5 = £60,000. Fixed cost remains £30,000. Flexed total = £90,000. The £80,000 figure is the original unflexed budget; £96,000 wrongly flexes the fixed costs as well; and £60,000 is the variable element only. The point of flexing is fair comparison at the actual volume.
The standard material usage for a product is 4 kg per unit at a standard price of £3.00 per kg. During the period 2,000 units were produced using 8,400 kg of material costing £24,360 in total. What is the materials usage variance?
- £1,200 favourable
- £1,200 adverse
- £840 favourable
- £400 adverse
Show answer and explanation
Answer: B. Usage variance = (standard quantity for actual output − actual quantity used) × standard price. Standard quantity = 2,000 × 4 = 8,000 kg. Actual used = 8,400 kg. Variance = (8,000 − 8,400) × £3.00 = −£1,200, i.e. £1,200 adverse, because more material was used than standard. The favourable version has the correct figure but the wrong direction; the £840 favourable figure is the materials price variance, (8,400 × £3) − £24,360; and £400 omits the multiplication by standard price.
The standard labour time for a product is 3 hours per unit at £12.00 per hour. During the period 1,500 units were produced. Actual hours worked were 4,400, at a total labour cost of £55,000. What is the labour efficiency variance?
- £1,200 adverse
- £1,200 favourable
- £2,200 adverse
- £100 favourable
Show answer and explanation
Answer: B. Efficiency variance = (standard hours for actual output − actual hours) × standard rate. Standard hours = 1,500 × 3 = 4,500. Actual hours = 4,400. Variance = (4,500 − 4,400) × £12 = £1,200 favourable, because fewer hours were used than standard. The adverse version has the right figure but wrong direction; the £2,200 adverse figure is the labour rate variance, (4,400 × £12) − £55,000; and £100 omits multiplication by the standard rate.
Budgeted sales were 5,000 units and actual sales were 5,600 units. The standard contribution per unit is £8.00. In a marginal costing system, what is the sales volume contribution variance?
- £4,800 adverse
- £600 favourable
- £3,000 favourable
- £4,800 favourable
Show answer and explanation
Answer: D. Sales volume contribution variance = (actual units − budgeted units) × standard contribution per unit = (5,600 − 5,000) × £8 = £4,800 favourable, because more units were sold than budgeted. In marginal costing the variance is valued at standard contribution, not standard profit. The adverse version has the wrong direction; the £600 figure is the volume difference in units, not valued; and £3,000 uses an incorrect contribution figure.
A purchasing manager buys cheaper, lower-grade raw material than the standard specifies. Which combination of variances is most likely to result?
- Favourable material price variance and adverse material usage variance
- Adverse material price variance and favourable material usage variance
- Favourable material price variance and favourable material usage variance
- Adverse material price variance and adverse material usage variance
Show answer and explanation
Answer: A. Buying below the standard price gives a favourable price variance. Lower-grade material is more likely to be wasted or rejected, increasing usage above standard and producing an adverse usage variance. This is a classic illustration of why variances should not be interpreted in isolation: an apparent purchasing saving may be offset by higher consumption elsewhere. The other combinations are inconsistent with the cause described.
Which of the following is a non-financial performance indicator?
- Return on capital employed
- Gross profit margin percentage
- The number of customer complaints received
- Net profit for the accounting period
Show answer and explanation
Answer: C. A non-financial performance indicator measures performance in units other than money. The number of customer complaints is a measure of service quality and is non-financial. Return on capital employed, gross profit margin and net profit are all financial measures expressed in or derived from monetary amounts. The syllabus stresses that good performance measurement uses both financial and non-financial indicators, especially in service organisations.
In which of the following situations is job costing the most appropriate costing method?
- A factory producing identical units of a single product on a continuous basis
- An oil refinery producing fuel through continuous processing
- A printing firm producing customised orders to individual customer specifications
- A water utility supplying a homogeneous service to all customers
Show answer and explanation
Answer: C. Job costing is used where output consists of separately identifiable jobs made to customer specification, such as bespoke printing orders, so that costs can be accumulated per job. The other three describe continuous or homogeneous output, which is suited to process costing — costs are averaged over large volumes of identical output rather than traced to individual jobs.
Budgeted production requires 40,000 kg of material. Opening material inventory is 5,000 kg and the company wishes to hold closing inventory of 7,000 kg. How many kg should be budgeted for purchase?
- 38,000 kg
- 42,000 kg
- 40,000 kg
- 52,000 kg
Show answer and explanation
Answer: B. Purchases budget = material needed for production + closing inventory − opening inventory = 40,000 + 7,000 − 5,000 = 42,000 kg. Because the company wants to raise its inventory, it must buy more than it uses. The 38,000 figure reverses the inventory adjustment, and 40,000 ignores the inventory movement altogether. The logic mirrors the production budget but applied to materials rather than finished units. 52,000 adds both the opening and the closing inventory to the production requirement.
Which of the following best describes the master budget?
- A budget prepared for just one single department
- A budget that is updated continuously throughout the year
- The summary budget combining all functional budgets into one overall plan
- A budget showing only planned capital expenditure
Show answer and explanation
Answer: C. The master budget is the overall summary that consolidates the individual functional budgets (sales, production, materials and so on) into a budgeted income statement, statement of financial position and cash budget for the whole organisation. A single-department budget is a functional budget, a continuously updated budget is a rolling budget, and a capital-only budget is a capital expenditure budget. The master budget brings everything together.
The original budget for 10,000 units showed total variable cost of £70,000. Actual output was 11,000 units with actual variable cost of £80,000. What is the variable cost variance based on a flexed budget?
- £10,000 adverse
- £7,000 adverse
- £3,000 favourable
- £3,000 adverse
Show answer and explanation
Answer: D. The budget must first be flexed to the actual output. Variable cost per unit = £70,000 ÷ 10,000 = £7. Flexed budget for 11,000 units = 11,000 × £7 = £77,000. Variance = £77,000 − £80,000 = £3,000 adverse, because actual cost exceeded the flexed allowance. The £10,000 adverse figure compares actual cost with the unflexed original budget, which is not a fair comparison at the higher output level.
The standard price of material is £4 per kg. During the period 10,000 kg were purchased and used at a total cost of £42,000. What is the materials price variance?
- £2,000 adverse
- £2,000 favourable
- £8,000 adverse
- £42,000 adverse
Show answer and explanation
Answer: A. Price variance = (standard cost of actual quantity) − (actual cost) = (10,000 × £4) − £42,000 = £40,000 − £42,000 = −£2,000, i.e. £2,000 adverse, because the actual price (£4.20/kg) exceeded the standard £4. The favourable version has the wrong direction. The £8,000 figure misapplies the standard price. The price variance isolates the effect of paying more or less than standard for the quantity bought.
The standard labour rate is £10 per hour. During the period 6,000 hours were worked at a total cost of £63,000. What is the labour rate variance?
- £3,000 favourable
- £3,000 adverse
- £6,300 adverse
- £60,000 adverse
Show answer and explanation
Answer: B. Rate variance = (standard rate × actual hours) − actual cost = (6,000 × £10) − £63,000 = £60,000 − £63,000 = −£3,000, i.e. £3,000 adverse, because the actual rate (£10.50/hour) was higher than the standard £10. The favourable version reverses the sign. The £6,300 figure misreads the data. The rate variance measures only the effect of paying a different rate than standard for the hours actually worked.
In a marginal costing operating statement, the reconciliation runs from budgeted contribution to actual contribution by adjusting for:
- Fixed overhead volume variances specifically
- Depreciation and amortisation charges specifically
- Sales price, sales volume contribution and variable cost variances
- Changes in the corporation tax rate
Show answer and explanation
Answer: C. Under marginal costing, the operating statement reconciles budgeted to actual results using the sales price variance, the sales volume contribution variance and the variable cost variances (materials, labour and variable overhead), with fixed overhead handled separately as a period cost. A fixed overhead volume variance belongs to absorption costing, not marginal costing. Depreciation, amortisation and tax rates are not the reconciling items in this statement.
Under responsibility accounting, a manager should be held accountable for:
- All costs incurred anywhere in the organisation
- The company's overall tax charge
- Only the costs that are easiest to measure
- Only those costs and revenues that the manager can control
Show answer and explanation
Answer: D. Responsibility accounting holds a manager accountable only for the costs and revenues within their control, so that performance assessment is fair and motivating. Charging a manager with costs they cannot influence — or with the whole organisation's costs or its tax charge — would be neither fair nor useful. Distinguishing controllable from uncontrollable items is central to designing meaningful responsibility centres.
Credit sales are £50,000 in May and £60,000 in June. Customers pay one month after the sale. How much cash will be received from credit customers in June?
- £60,000
- £50,000
- £110,000
- £55,000
Show answer and explanation
Answer: B. Because customers pay one month after the sale, the cash received in June relates to May's sales of £50,000. June's sales of £60,000 will be received in July. The £60,000 figure ignores the one-month lag, and £110,000 adds both months as if received together. A cash budget records receipts when the cash actually arrives, not when the sale is made — the timing difference is the whole point of the exercise. £55,000 averages the two months, which ignores the one-month lag.
A budget at 8,000 units has variable costs of £48,000 and fixed costs of £20,000. What is the flexed total cost allowance for an actual output of 9,000 units?
- £68,000
- £76,500
- £74,000
- £54,000
Show answer and explanation
Answer: C. Variable cost per unit = £48,000 ÷ 8,000 = £6. Flexed variable cost for 9,000 units = 9,000 × £6 = £54,000. Fixed cost stays at £20,000. Flexed total = £54,000 + £20,000 = £74,000. The £68,000 figure is the original unflexed budget. The £76,500 figure wrongly flexes the fixed costs as well. Only variable costs are flexed to the actual activity level; fixed costs remain constant within the relevant range.
The standard usage is 5 kg per unit at £6 per kg. Actual production was 1,000 units using 5,200 kg. What is the materials usage variance?
- £1,200 favourable
- £31,200 adverse
- £200 adverse
- £1,200 adverse
Show answer and explanation
Answer: D. Usage variance = (standard quantity for actual output − actual quantity) × standard price = (1,000 × 5 − 5,200) × £6 = (5,000 − 5,200) × £6 = −£1,200, i.e. £1,200 adverse, because 200 kg more than standard was used. The favourable version has the wrong direction. The £200 figure omits the standard price. The usage variance values the excess or saving in quantity at the standard price per kg. £31,200 is the actual quantity at standard price (5,200 × £6), not a variance.
The standard time is 2 hours per unit at £9 per hour. Actual production was 2,500 units using 4,800 hours. What is the labour efficiency variance?
- £1,800 favourable
- £1,800 adverse
- £200 favourable
- £43,200 favourable
Show answer and explanation
Answer: A. Efficiency variance = (standard hours for actual output − actual hours) × standard rate = (2,500 × 2 − 4,800) × £9 = (5,000 − 4,800) × £9 = £1,800 favourable, because 200 fewer hours than standard were used. The adverse version reverses the sign. The £200 figure omits the standard rate. The efficiency variance values the time saved or lost at the standard rate per hour. £43,200 is the actual hours at standard rate (4,800 × £9), not a variance.
Variable overhead is absorbed at £3 per labour hour. Actual labour hours were 4,000 and actual variable overhead incurred was £11,600. What is the variable overhead expenditure variance?
- £400 adverse
- £400 favourable
- £1,600 adverse
- £12,000 adverse
Show answer and explanation
Answer: B. Expenditure variance = (standard rate × actual hours) − actual variable overhead = (4,000 × £3) − £11,600 = £12,000 − £11,600 = £400 favourable, because less was spent than the £12,000 the actual hours should have cost. The adverse version reverses the sign. The expenditure variance compares the variable overhead that should have been incurred for the hours worked with the amount actually incurred. £1,600 adverse does not follow from the rate, hours and spending given.
In an integrated accounting system, the purchase of raw materials on credit would be recorded by:
- Debiting work in progress and crediting cash
- Debiting payables and crediting the material control account
- Debiting the material control account and crediting payables
- Debiting finished goods and crediting material control
Show answer and explanation
Answer: C. Buying raw materials on credit increases the material (stores) control account, which is debited, and increases the amount owed, so payables are credited. Debiting payables would reduce the liability, which is wrong for a purchase. The work-in-progress and finished-goods entries relate to later stages of production. Integrated accounts combine cost and financial records, so the cost ledger entries follow normal double-entry principles.
A batch of 500 identical units incurs total costs of £6,000. What is the cost per unit?
- £0.12
- £8.33
- £500.00
- £12.00
Show answer and explanation
Answer: D. In batch costing, the cost per unit = total batch cost ÷ number of units in the batch = £6,000 ÷ 500 = £12.00. The £0.12 figure inverts the calculation (units relative to cost in the wrong order). Batch costing is used where identical items are produced in distinct batches; the batch cost is accumulated and then spread evenly over the units in that batch to give a cost per unit. £8.33 does not follow from the batch figures.
Budgeted sales are 30,000 units. The company plans to reduce finished goods inventory from 9,000 units to 4,000 units over the period. How many units should be produced?
- 35,000 units
- 43,000 units
- 30,000 units
- 25,000 units
Show answer and explanation
Answer: D. Production = sales + closing inventory − opening inventory = 30,000 + 4,000 − 9,000 = 25,000 units. Because inventory is being run down by 5,000 units, production is below sales, with the shortfall met from existing stock. The 35,000-unit figure reverses the adjustment, and 30,000 ignores the inventory change. Reducing inventory lets the company produce fewer units than it sells in the period. 43,000 adds both the opening and the closing inventory to sales.
A principal purpose of a standard costing system is to:
- Provide a benchmark against which actual performance is measured
- Replace the need for preparing a separate cash budget
- Eliminate every variance from occurring at all
- Calculate the company's corporation tax charge
Show answer and explanation
Answer: A. Standard costing sets predetermined costs for materials, labour and overheads, providing a benchmark against which actual results are compared so that variances can be identified, investigated and controlled. It does not replace the cash budget, cannot eliminate variances (it is designed to reveal them), and is unrelated to tax computation. The control benefit of comparing actual against standard is the main purpose.
The standard selling price is £20 per unit. In the period, 4,000 units were sold at an actual price of £19. What is the sales price variance?
- £4,000 favourable
- £4,000 adverse
- £1,000 adverse
- £76,000 adverse
Show answer and explanation
Answer: B. Sales price variance = (actual price − standard price) × actual units sold = (£19 − £20) × 4,000 = −£1 × 4,000 = £4,000 adverse, because each unit was sold for £1 less than standard. The favourable version reverses the sign. The £1,000 figure ignores the number of units. The sales price variance isolates the profit effect of selling at a different price from standard, valued over the actual quantity sold. £76,000 is the actual revenue (4,000 × £19), not a variance.
An adverse labour efficiency variance, combined with a favourable materials price variance, might be jointly explained by:
- Selling more units than were originally budgeted
- Paying workers a higher wage rate than standard
- Buying cheaper, lower-quality material that's harder to work with
- Holding less inventory than planned
Show answer and explanation
Answer: C. Cheaper, lower-quality material gives a favourable materials price variance but is often harder to work with, so more labour time is needed, producing an adverse labour efficiency variance — a classic interrelationship between variances. Paying a higher wage rate would affect the labour rate variance, not efficiency. Sales volume and inventory levels do not explain this particular pairing. Variances should be interpreted together, not in isolation.
In an integrated accounting system, over-absorbed production overhead is:
- Debited to the income statement, reducing profit
- Ignored entirely by the business until the year end
- Carried forward within closing inventory value
- Credited to the income statement, increasing profit
Show answer and explanation
Answer: D. Over-absorption means more overhead was charged to production than was actually incurred, so the excess is credited to the income statement, increasing profit. Under-absorption is the reverse — debited to the income statement, reducing profit. Over- or under-absorbed overhead is not held in inventory or ignored; it is taken to the income statement in the period in which it arises, adjusting the profit for the over- or under-recovery.
Performance measurement in a not-for-profit organisation is often based on the 'three Es'. These are:
- Economy, efficiency and effectiveness
- Earnings, expenses and equity
- Engagement, ethics and environment
- Expansion, exports and employment
Show answer and explanation
Answer: A. Not-for-profit performance is commonly assessed using value for money — economy (obtaining resources at low cost), efficiency (getting the most output from resources) and effectiveness (achieving the intended objectives). Because there is no profit measure, these three Es provide a structured alternative. The other options are not the recognised framework; the value-for-money model is what the three Es refer to.
Which of the following is a non-financial performance indicator for a service business?
- Net profit margin percentage
- Average customer waiting time
- Return on capital employed
- Gross profit for the period
Show answer and explanation
Answer: B. Average customer waiting time measures service quality in non-monetary terms and is a non-financial performance indicator, particularly important in service businesses where quality and timeliness matter. Net profit margin, return on capital employed and gross profit are all financial measures expressed in money. Good performance measurement combines financial indicators with non-financial ones such as quality, speed and customer satisfaction.
Sales were £40,000 in March, £55,000 in April and £60,000 in May. Customers pay 50% in the month of sale and 50% in the following month. How much cash is received in April?
- £47,500
- £55,000
- £60,000
- £50,000
Show answer and explanation
Answer: A. April receipts = 50% of April sales + 50% of March sales = (0.5 × £55,000) + (0.5 × £40,000) = £27,500 + £20,000 = £47,500. The £55,000 figure ignores the split and the timing lag. A cash budget records receipts when the cash actually arrives, so each month's cash combines part of the current month's sales with part of the previous month's, reflecting the payment pattern. £50,000 takes half of March and May sales instead of March and April.
The standard material cost is 4 kg per unit at £5 per kg. Actual production was 1,000 units and the actual material cost was £21,500. What is the total materials cost variance?
- £1,500 favourable
- £1,500 adverse
- £500 adverse
- £21,500 adverse
Show answer and explanation
Answer: B. Standard material cost for actual output = 1,000 units × 4 kg × £5 = £20,000. Total materials variance = standard cost − actual cost = £20,000 − £21,500 = −£1,500, i.e. £1,500 adverse, because actual cost exceeded standard. The favourable version reverses the sign. The total materials variance combines the price and usage effects and compares what the output should have cost with what it actually cost.
The standard labour cost is 2 hours per unit at £10 per hour. Actual production was 800 units and the actual labour cost was £15,200. What is the total labour cost variance?
- £1,600 favourable
- £800 adverse
- £800 favourable
- £15,200 adverse
Show answer and explanation
Answer: C. Standard labour cost for actual output = 800 units × 2 hours × £10 = £16,000. Total labour variance = standard cost − actual cost = £16,000 − £15,200 = £800 favourable, because actual cost was below standard. The adverse version reverses the sign. The total labour variance combines the rate and efficiency effects, comparing the standard cost of the output achieved with the actual labour cost incurred. £1,600 is the standard hours for the output (800 × 2), not a cost variance.
Variable overhead is absorbed at £4 per labour hour. The standard hours for actual output were 2,000, but 2,150 hours were actually worked. What is the variable overhead efficiency variance?
- £600 favourable
- £8,600 adverse
- £150 adverse
- £600 adverse
Show answer and explanation
Answer: D. Efficiency variance = (standard hours for actual output − actual hours) × standard variable overhead rate = (2,000 − 2,150) × £4 = −£600, i.e. £600 adverse, because more hours than standard were taken, absorbing more variable overhead. The favourable version reverses the sign. The £150 figure omits the £4 rate. The variable overhead efficiency variance follows the labour efficiency variance, valued at the variable overhead rate per hour. £8,600 is the actual hours at the standard rate (2,150 × £4), not a variance.
A budget for 5,000 units shows variable costs of £30,000 and fixed costs of £15,000. What is the flexed total cost allowance for an actual output of 6,000 units?
- £51,000
- £45,000
- £54,000
- £36,000
Show answer and explanation
Answer: A. Variable cost per unit = £30,000 ÷ 5,000 = £6. Flexed variable cost for 6,000 units = 6,000 × £6 = £36,000. Fixed cost stays at £15,000. Flexed total = £36,000 + £15,000 = £51,000. The £45,000 figure is the original unflexed budget; £54,000 wrongly flexes the fixed cost too; and £36,000 is the variable element only. Only variable costs are flexed to actual volume; fixed costs are unchanged within the relevant range.
A job uses direct materials of £1,200 and 40 labour hours. Labour is paid £15 per hour and overhead is absorbed at £10 per labour hour. What is the total cost of the job?
- £1,800
- £2,200
- £1,200
- £2,600
Show answer and explanation
Answer: B. Direct labour = 40 hours × £15 = £600. Overhead absorbed = 40 hours × £10 = £400. Total job cost = materials £1,200 + labour £600 + overhead £400 = £2,200. The £1,800 figure omits the overhead, and £1,200 is materials alone. Job costing accumulates the direct materials, direct labour and absorbed overhead for each individual job to arrive at its total cost. £2,600 counts the £400 overhead twice.
The production efficiency ratio compares:
- Comparing cash inflows with cash outflows for the period
- Comparing total sales revenue with total costs incurred
- Actual output in standard hours with actual hours worked
- Comparing fixed costs with variable costs incurred
Show answer and explanation
Answer: C. The efficiency ratio measures how productively labour time was used by expressing the actual output in standard hours as a percentage of the actual hours worked; a ratio above 100% means work was done faster than standard. It is not about comparing sales with costs, cash flows, or cost types. The ratio supports control by showing whether labour produced more or less output than the time taken would suggest at standard.
The sales budget is 7,000 units at a selling price of £35 each. What is the budgeted sales revenue?
- £200,000
- £245,000
- £42,000
- £35,000
Show answer and explanation
Answer: B. Budgeted sales revenue = units × selling price = 7,000 × £35 = £245,000. The sales budget is usually the starting point for the whole budgeting process, since production, materials and other budgets flow from expected sales. The other figures do not follow from multiplying the budgeted volume by the budgeted price, which is the basic revenue calculation.
Budgeted sales were 4,000 units and actual sales were 3,600 units. The standard contribution is £15 per unit. In a marginal costing system, what is the sales volume contribution variance?
- £400 adverse
- £6,000 favourable
- £6,000 adverse
- £54,000 adverse
Show answer and explanation
Answer: C. Sales volume contribution variance = (actual units − budgeted units) × standard contribution = (3,600 − 4,000) × £15 = −£6,000, i.e. £6,000 adverse, because fewer units were sold than budgeted. The favourable version reverses the sign. The £400 figure is the volume shortfall in units, not valued. In marginal costing the volume variance is valued at standard contribution per unit, not standard profit. £54,000 is the actual sales volume at standard contribution (3,600 × £15), not a variance.
A favourable materials price variance combined with an adverse materials usage variance is most likely explained by:
- Buying higher-quality material at a higher price
- Selling a greater number of units than budgeted
- Paying workers a higher hourly rate
- Buying cheaper material that ends up being wasted more
Show answer and explanation
Answer: D. Buying cheaper material gives a favourable price variance, but lower-quality material is often wasted or rejected, increasing usage above standard and producing an adverse usage variance — a classic interrelationship. Higher-quality material at a higher price would give the opposite price variance. Wage rates affect labour variances, and sales volume affects sales variances, neither of which explains this materials pairing. Variances should be read together, not in isolation.
The original budget for 2,000 units showed variable costs of £40,000 and fixed costs of £10,000. Actual output was 2,500 units with a total actual cost of £62,000. What is the total cost variance based on a flexed budget?
- £2,000 adverse
- £12,000 adverse
- £2,000 favourable
- £10,000 adverse
Show answer and explanation
Answer: A. Variable cost per unit = £40,000 ÷ 2,000 = £20. Flexed variable cost for 2,500 units = 2,500 × £20 = £50,000, plus fixed cost £10,000 = flexed total £60,000. Variance = £60,000 − £62,000 = £2,000 adverse, because actual cost exceeded the flexed allowance. The £12,000 adverse figure wrongly compares actual cost with the unflexed original budget of £50,000, which is not a fair comparison at the higher output. A £2,000 favourable variance has the right size but the wrong direction: actual cost exceeded the flexed budget.
In an integrated accounting system, the gross wages incurred for the period are initially recorded by debiting:
- Payables
- The wages control account
- Sales
- The income statement directly
Show answer and explanation
Answer: B. Gross wages are first collected in the wages control account (debited), and are then analysed and transferred out to work in progress (direct labour) and to overhead (indirect labour). They are not debited to payables, which is a liability, nor to sales, and they are not taken straight to the income statement. The control account acts as a gathering point before the labour cost is charged to production and overhead.
A batch of 250 identical units incurs total costs of £4,500. What is the cost per unit?
- £250.00
- £20.00
- £18.00
- £0.056
Show answer and explanation
Answer: C. Cost per unit in batch costing = total batch cost ÷ number of units = £4,500 ÷ 250 = £18.00. The £0.056 figure inverts the calculation (units relative to cost). Batch costing accumulates the costs of producing a batch of identical items and then spreads them evenly across the units in the batch to give a cost per unit, which is used for valuation and pricing. £20.00 does not follow from the batch figures.
The production volume (capacity) ratio compares:
- Comparing fixed costs with variable costs incurred
- Comparing total sales with total costs incurred
- Comparing contribution with total sales revenue
- The actual hours worked with the budgeted hours
Show answer and explanation
Answer: D. The capacity ratio measures how much of the budgeted capacity was used by expressing the actual hours worked as a percentage of the budgeted hours. It is distinct from the efficiency ratio (actual output in standard hours against actual hours) and the activity ratio (output in standard hours against budgeted hours). It is not about comparing sales, contribution or cost types. The capacity ratio focuses on hours worked relative to plan.
Other BA2 topics
- Context of management accounting (15 questions)
- Costing (37 questions)
- Decision making (53 questions)
- All BA2 sections, with the timed mock exam
- Spotted a mistake? Report it and it will be corrected.